"Over our 25 years of service to you,
Plasticair has had some memorable projects that deserve to be high-lighted. We have selected
a few occasions that show a wide spectrum of Plasticair’s ability to successfully rise to industry demands and
challenges".
Proven
Experience
Industry Sector: Water Treatment
Located in the Detroit Metropolitan Area.
Requirement : 1,300,000 CFM extraction of Methane and
other dangerous sewer gases.
Plasticair Supplied 23 AMCA Air and Sound Certified
Explosion Proof Vane Axial Flow Fans
Industry Sector: Laboratory Exhaust
Located in the Boston Metropolitan Area.
Requirement: 780,000 CFM extraction of Lab Building
Exhaust :
Plasticair supplied 24 Fan Systems that incorporated
SKYPLUME technology. The systems are designed to enhance effective plume
heights up to and well over100 feet above roof level.
Industry Sector: Laboratory Exhaust
Located in the Miami Metropolitan Area.
Requirement:: A 23,000 CFM lab Exhaust System
designed to withstand hurricane winds of 146 mph.
Plasticair Supplied a complete FRP SKYPLUME System
size 44 that has been witness to the Florida Hurricane season of 2004.
Industry Sector: Tobacco Curing
Located in Hong Kong.
Requirement:: 80,000 CFM Extraction of hydrogen
sulfide and ammonia fumes.
Plasticair Supplied a complete two stage Polycube
Scrubbing System that achieved 99% removal with only 2 gpm per square
foot of scrubbing liquor required.
Industry Sector: Magnesium Processing
Located in Quebec.
Requirement:: 15,000 CFM Extraction @ 29.8” W.G.
Static Pressure. The system required, a one hundred percent redundancy, and the fumes present
within the air stream where HCl & HF @ 160 F.
Plasticair Supplied a quantity of two model 28 HPB’s
to handle this application. The client saved ten’s of thousands of
dollars by selecting Plasticair and FRP construction over exotic metal
construction.
Industry Sector: Terrorism
Located; Government buildings,
Washington D.C.
Requirement : Anthrax decontamination
system
Plasticair supplied this custom unit
within ten days. It was designed as a stripper to generate 500 ppm of
Carbon Dioxide in offices that contained anthrax particles. The system
was successful in destroying the Anthrax Bacteria. The system was
designed within 36 hours with the criteria that it had to be able to be
moved throughout all doors and hallways within the building.